ClearSpot AI — EPC Solar Project Automation | From Feasibility to O&M
⚡ 8 AI Agents · Full EPC Lifecycle · From Feasibility to O&M

Automate Your Entire
Solar EPC Project
From Day One

ClearSpot AI deploys 8 specialised agents across every EPC phase — site assessment, financial modelling, engineering, permitting, procurement, construction, commissioning, and O&M lifecycle.

No hardware · No migration · 1 GW+ analysed · Works with your existing project data

8
AI Agents across full EPC lifecycle
−40%
Average project schedule saved
32
Automated tasks per project
1 GW+
Solar projects already analysed

Every Phase Has Delays. Every Delay Has a Cost.

EPC project managers spend 60–70% of their time on manual data collection, report writing, and coordination tasks that ClearSpot AI automates end-to-end — from the first desktop feasibility study to O&M handover.

One Platform. Every Phase Automated.

Each agent runs automatically as soon as its phase begins. Zero manual handoff between phases.

🔍
Phase A — Feasibility & Site Assessment
Site Assessment Agent · 4 automated tasks
✓ Completed
A1.1
Desktop Feasibility Study
Site constraints, grid proximity, land suitability
AI Auto
A2.1
GHI Solar Resource (PVGIS)
Satellite irradiance retrieval via PVGIS-SARAH2
AI Auto
A2.4
Energy Yield P50/P75/P90
Probabilistic yield estimation for lender bankability
AI Auto
A3.5
Seismic & Geotechnical Survey
Soil classification and seismic risk scoring
AI Auto
💰
Phase B — Financial Model & Bankability
Financial Model Agent · 4 automated tasks
✓ Completed
B1.1
CAPEX Estimation
Full capital expenditure breakdown by component
AI Auto
B1.2
OPEX & Revenue Projections
Operating cost model + PPA revenue forecast
AI Auto
B2.1
LCOE / IRR / NPV
Key financial metrics for investor and lender pack
AI Auto
B2.2
25-Year Cash Flow Model
Full project cashflow with debt service and LD risk
AI Auto
⚙️
Phase C — Engineering & System Design
Electrical Design Agent · 4 automated tasks
⏳ In Progress
C1.1
PV Layout & String Design
Module placement, row spacing, stringing config
AI Auto
C1.2
Electrical Single Line Diagram
SLD with protection scheme auto-generated
AI Auto
C2.1
MV/HV Transformer Sizing
Transformer rating and impedance calculation
AI Auto
C2.2
Grid Connection Study
TSO/DSO connection feasibility and compliance check
AI Auto
📋
Phase D — Permitting & Compliance
Permitting Agent · 4 automated tasks
⏳ In Progress
D1.1
Environmental Impact Assessment
EIA document prep, authority submission tracker
AI Auto
D1.2
Building Permit Application
Municipal planning approval documentation
AI Auto
D2.1
Grid Connection Agreement
TSO capacity allocation and connection offer
AI Auto
D2.2
Land Lease Finalisation
Legal review checklist, notarisation status
AI Auto
📦
Phase E — BOM & Procurement
Procurement Agent · 4 automated tasks
⏸ Pending
E1.1
Bill of Materials Generation
Complete equipment list with quantities auto-generated
AI Auto
E1.2
Vendor RFQ & Comparison
RFQ to qualified suppliers with scoring matrix
AI Auto
E2.1
Equipment Procurement Tracking
PO status, delivery milestones and alerts
AI Auto
E2.2
Logistics & Delivery Schedule
Shipping, customs clearance and site delivery plan
AI Auto
🏗️
Phase F — Construction & HSSE
Construction Agent · 4 automated tasks
⏸ Pending
F1.1
CPM Schedule Baseline
Critical path method schedule auto-generated from BOM
AI Auto
F1.2
Daily Construction Logs
Progress, weather and workforce reports auto-filed
AI Auto
F2.1
ITP & Quality Inspections
Inspection and test plan execution tracking
AI Auto
F2.2
NCR Management
Non-conformance report creation, tracking, resolution
AI Auto
Phase G — Commissioning & PAC
Commissioning Agent · 4 automated tasks
⏸ Pending
G1.1
IV Curve Testing
Module-level IV characterisation and fault detection
AI Auto
G1.2
DC Insulation Resistance
String insulation verification at energisation
AI Auto
G2.1
AC Continuity & Relay Tests
Protection relay and switchgear testing logs
AI Auto
G2.2
PAC Certificate Issuance
Auto-compiled provisional acceptance certificate pack
AI Auto
🔄
Phase H — O&M Lifecycle & Performance
O&M Lifecycle Agent · 4 automated tasks
⏸ Pending
H1.1
Performance Guarantee Setup
PR guarantee and LD threshold definition
AI Auto
H1.2
Measured vs Guaranteed Tracking
Continuous PR monitoring against contractual guarantees
AI Auto
H2.1
LD Exposure Monitoring
Liquidated damages risk tracker with early warning
AI Auto
H2.2
O&M Reporting & Handover
Full operational handover documentation auto-generated
AI Auto

What Each Agent Saves You

Quantified time and cost savings across a typical 50–100 MW EPC project.

PhaseManual TimeWith ClearSpot AITime SavedCost Impact
🔍 Feasibility & Site Assessment3–4 weeks2–3 days−85%Save €15k–€30k
💰 Financial Model & Bankability2–3 weeks1–2 days−80%Save €10k–€20k
⚙️ Engineering & System Design4–8 weeks1–2 weeks−60%Save €40k–€80k
📋 Permitting & ComplianceManual tracking onlyAuto-tracked & filed−50% adminSave €20k–€40k
📦 BOM & Procurement2–4 weeks RFQ cycle3–5 days−70%Save €30k–€60k
🏗️ Construction & HSSEDaily manual logsAuto-logged & tracked−65% reportingSave €15k–€25k
⚡ Commissioning & PAC2–4 weeks QA3–5 days−75%Save €30k–€60k
🔄 O&M Lifecycle1 FTE ongoing0.1 FTE oversight−90%Save €50k–€100k/yr
TOTAL PROJECT SAVINGWeeks off schedule€200k–€415k saved

Up and Running in 48 Hours

No integration project. No hardware. Agents activate phase by phase as your project progresses.

1

Connect Project Data

Upload your site data, financials, or SCADA export in any format.

2

Agents Activate

8 agents run automatically phase by phase — no manual handoff.

3

Outputs Delivered

Reports, models, and actions delivered directly to your team.

4

Ship On Time

COD achieved faster, handover cleaner, LD exposure eliminated.

Ready to Automate Your Next Solar EPC Project?

Book a 25-minute demo. We'll show you how ClearSpot agents work across your current project phases — using your data or a live example.

Book Free EPC Demo →

    Get Your Custom ROI Analysis


    Discover how much you could save in your first year























    * Our experts will contact you within 24 hours with your personalized analysis