Teams running utility-scale solar usually ask two pricing questions early: what does ClearSpot cost per MW, and what moves a portfolio up or down that range? This page answers both. ClearSpot pricing runs from $50 to $1,000 per MW per year (platform subscription), and where you land depends on portfolio scale, site size, and the depth of automation and monitoring you choose.
In short: ClearSpot is an AI and drone automation platform for utility-scale solar O&M that combines autonomous drone inspection, AI fault detection, prioritised work orders, monitoring analytics and automated reporting. It is priced as a platform subscription, from $50 to $1,000 per MW per year, based on portfolio scale, site size and depth of automation and monitoring. A short scoping call turns that range into a firm quote for your portfolio. Pricing, onboarding, hosting and reported results are also summarised on the ClearSpot key facts page.
Want a number for your own sites? Book a demo and scoping call and we will map your portfolio to the right scope.
What ClearSpot pricing covers
ClearSpot is one platform rather than a set of separate tools. Depending on the scope you select, a subscription can include the following modules, all described in more detail on the automated solar operations platform page:
- Autonomous drone inspection with AI analysis of thermal and visual imagery
- AI fault detection and classification at module, string and inverter level
- Prioritised work orders that route findings to field teams
- Monitoring and performance analytics across sites
- Automated inspection, performance and portfolio reports
Because these modules build on one another, the per-MW price reflects how many of them you use and how continuously they run, not a fixed bundle that every customer pays for.
The three pricing drivers
Three factors decide where a portfolio sits between $50 and $1,000 per MW per year. They are listed below in the order buyers usually feel them most.
1. Depth of automation and monitoring
This is the largest driver. A scope limited to drone and AI inspection with reporting sits toward the lower end of the range. Adding prioritised work orders, then monitoring analytics, then full automation with continuous monitoring moves the price toward the upper end, because each layer adds data processing, integrations and ongoing analysis.
2. Portfolio scale
Total MW under management affects the per-MW rate. Larger portfolios spread onboarding, integration and configuration work over more capacity, which tends to lower the per-MW figure for the same scope. Smaller portfolios carry that fixed work over fewer MW, which tends to raise it.
3. Site size
The size of individual sites matters separately from the portfolio total. A portfolio made of a few large sites is usually more efficient to inspect and integrate per MW than one made of many small, dispersed sites, which need more flights, more mobilisations and more data connections for the same capacity.
Indicative pricing tiers
The table below ranks typical scopes against the three drivers. It shows relative position within the published range only; it is not a price list, and your quote depends on your portfolio.
| Scope | What it typically includes | Indicative position in the $50–$1,000 per MW per year range |
|---|---|---|
| Inspection and reporting | Drone and AI inspection, fault detection, automated inspection reports | Lower end of range |
| Inspection and work orders | The above, plus prioritised work orders for field teams | Lower to middle of range |
| Inspection, work orders and monitoring | The above, plus monitoring and performance analytics across sites | Middle to upper part of range |
| Full automation and continuous monitoring | All modules running continuously with automated portfolio reporting | Upper end of range |
Within any tier, a large portfolio of large sites tends to sit lower and a small portfolio of small, dispersed sites tends to sit higher.
Worked illustration: a 100 MW portfolio
Illustrative only, not a quote. To show how the per-MW range translates into a portfolio budget, take a 100 MW portfolio and apply the two ends of the range:
- Lower end: 100 MW × $50 per MW per year = $5,000 per year
- Upper end: 100 MW × $1,000 per MW per year = $100,000 per year
So a 100 MW portfolio would fall somewhere between $5,000 and $100,000 per year for the platform subscription. Where it lands within that band depends on the scope chosen and on how the 100 MW is split across sites. A scoping call narrows this to a firm figure.
How to estimate where you will land
Before a scoping call, it helps to have answers to these questions ready:
- How many sites are in the portfolio, and what is the MW size of each?
- How often do you inspect today, and how often would you like to?
- Which monitoring, SCADA or data sources should the platform connect to?
- Do you need work orders routed to in-house teams, an O&M contractor, or both?
- Which reports do owners, lenders or asset managers expect, and how often?
If you are comparing platforms more broadly, our guide to solar O&M software covers what to look for beyond price.
Weighing price against outcomes
Per-MW price is only half of the comparison. The other half is what the platform changes in your operations. Across deployments, ClearSpot reports 99% fault detection, a 30–50% reduction in O&M costs, a 65% reduction in downtime and 97%+ plant availability. For a worked view of how inspection method affects cost, see drone vs manual solar inspection: cost and benefit, and for the wider budget picture read the true cost of solar O&M.
For one example of the operational effect, see how automated performance reporting removes manual spreadsheet work from monthly reporting cycles.
Getting a quote
- Demo: see the platform on data similar to your sites.
- Scoping call: share portfolio size, site list and the modules you need.
- Quote: receive a per-MW annual subscription price within the $50 to $1,000 per MW per year range for your chosen scope.
Frequently asked questions
How much does ClearSpot cost?
ClearSpot is priced from $50 to $1,000 per MW per year (platform subscription). The exact rate depends on portfolio scale, site size, and the depth of automation and monitoring you choose.
What makes the price higher or lower?
Deeper automation and continuous monitoring move the price up the range. Larger portfolios and larger individual sites tend to lower the per-MW rate for the same scope, because fixed onboarding and integration work is spread over more capacity.
What would a 100 MW portfolio cost?
As an illustration only, 100 MW at $50 per MW per year is $5,000 per year, and at $1,000 per MW per year it is $100,000 per year. Your actual figure depends on scope and site mix and is confirmed in a scoping call.
Can I start with inspection only and add monitoring later?
Yes. The modules build on one another, so many teams start with inspection and reporting, which sits toward the lower end of the range, and add work orders or monitoring as they go.
Is ClearSpot suitable for O&M contractors and EPCs as well as asset owners?
Yes. ClearSpot is used by teams that operate or maintain utility-scale solar, including IPPs, asset owners, O&M contractors and EPCs, typically with portfolios from around 50 MW to 1 GW.
How do I get an exact quote?
Book a demo through the get-a-demo page. After a short scoping call covering your sites and the modules you need, we provide a per-MW quote for your portfolio.
Next step
Pricing is easiest to judge against your own sites. Book a ClearSpot demo to see the platform and get a per-MW annual subscription quote for your portfolio.